Energies Media
  • Magazine
    • Digital Magazine
    • Digital Magazine Archive
  • Features
  • Upstream
  • Midstream
  • Downstream
  • Renewable
    • Solar
    • Wind
    • Hydrogen
    • Nuclear
  • People
  • Events
  • Advertise
No Result
View All Result
Energies Media
No Result
View All Result

Epic Pipeline Announces Capacity Agreement With BP Energy Company For New 650-Mile NGL Pipeline From The Permian Basin To Corpus Christi

by Energies Media Staff
September 30, 2017
in News, 2017 November-December, Midstream, Shale, Texas
Epic Pipeline Announces Capacity Agreement With BP Energy Company For New 650-Mile NGL Pipeline From The Permian Basin To Corpus Christi
Baker Hughes

Study ties Curtis Bay coal terminal work to neighborhood soot

APA Group clears Indigenous land agreement for Beetaloo Basin pipeline

EPIC Y Grade Pipeline, LP, a subsidiary of EPIC Y Grade Services, LP and EPIC Midstream Holdings, LP, today announced that it has signed a definitive agreement with BP Energy Company to anchor a new 650-mile natural gas liquids (NGL) pipeline that will be known as “EPIC NGL Pipeline,” which will link producers’ NGL reserves in the Permian and Eagle Ford Basins to Gulf Coast refiners, petrochemical companies and export markets. The EPIC NGL Pipeline has secured a capital commitment from funds managed by Ares Management, L.P. (NYSE: ARES). The EPIC NGL Pipeline, which has commenced construction, will run side-by-side with the previously announced EPIC Crude Oil Pipeline for most of the route.

The EPIC NGL Pipeline will have throughput capacity of at least 220,000 barrels per day with multiple origin points in the Delaware and Midland Basins. Destinations will include interconnects near Orla, Benedum and Corpus Christi, Texas, where EPIC’s affiliate plans to build a fractionation complex to accommodate the pipeline’s volume. In the fourth quarter of 2017, EPIC will conduct a FERC open season, when interested shippers will have an opportunity to secure firm capacity on the EPIC NGL Pipeline.

EPIC is actively acquiring rights of way, and in some cases, multi-line rights will be pursued to accommodate both EPIC’s NGL and crude oil projects. EPIC plans to have the initial phase of the pipeline in-service in early 2018.

“We are delighted to collaborate with BP, which brings to this project global commercial expertise for both NGLs and purity products,” said Phil Mezey, EPIC’s Chief Executive Officer. “We look forward to providing a straight-forward, independent solution to shippers’ NGL marketing and transportation needs.”

“BP is excited to extend its producer services reach into the prolific Delaware and Midland basins, while at the same time serving the growing needs of the petrochemical and refining sectors along the U.S. Gulf Coast,” said Orlando Alvarez, BP Energy Company’s President and CEO.

“Ares is looking forward to collaborating with the EPIC team and BP on building this important infrastructure project,” commented Nate Walton, Partner at Ares Management.

Author Profile
Energies Media Staff
Website
Author Articles
  • Energies Media Staff
    https://energiesmedia.com/author/oilmanwp/
    Drones
    September 8, 2025
    Revolutionizing Renewable Energy with Advanced Drone Technology
  • Energies Media Staff
    https://energiesmedia.com/author/oilmanwp/
    Global Shale Oil and Gas Landscape Set for Growth Beyond US
    August 26, 2025
    Global Shale Oil and Gas Landscape Set for Growth Beyond US
  • Energies Media Staff
    https://energiesmedia.com/author/oilmanwp/
    E-Fuels
    August 13, 2025
    2nd Annual World E-Fuels Summit
  • Energies Media Staff
    https://energiesmedia.com/author/oilmanwp/
    What Happens to Solar and Wind Systems During Natural Disasters?
    August 6, 2025
    What Happens to Solar and Wind Systems During Natural Disasters?
  • Energies Media Staff
    https://energiesmedia.com/author/oilmanwp/
    ship on body of water at night
    August 1, 2025
    Industry leaders to speak at Wood Mackenzie’s Carbon Capture, Utilization and Storage Conference 2025
  • Energies Media Staff
    https://energiesmedia.com/author/oilmanwp/
    ROGII and NRGX Technologies Ltd. Partner to Deliver Seamless LAS Data Integration for Upstream Workflows
    July 31, 2025
    ROGII and NRGX Technologies Ltd. Partner to Deliver Seamless LAS Data Integration for Upstream Workflows
Tags: #OilmanNEWS
Pipeline
TAMU

In This Issue

Energies Media Summer 2025

ENERGIES Media (Summer 2025)


Why Energy Companies Need a CX Revolution


The Hidden Value in Waste Oil: A Sustainable Solution for the Future


How to Deploy Next-Gen Energy Savers Without Disrupting Operations


Dewey Follett Bartlett, Jr.: Tulsa’s Champion of Independents


U.S. Oil Refineries Face Critical Capacity Test Amid Rising Demand


Meeting Emergency Preparedness and Response Criteria


NeverNude Coveralls: A Practical Solution for Everyday Dignity


Maximizing Clean Energy Tax Credits Under the Inflation Reduction Act


Bringing Safety Forward in Offshore Operations


Moving Energy Across Space and Time


ENERGIES Cartoon (Summer 2025)


Letter from the Managing Editor (Summer 2025)


Energies Media Interactive Crossword Puzzle – Summer 2025

E-Fuels
ADIPEC
  • Terms
  • Privacy

© 2025 by Energies Media

No Result
View All Result
  • Magazine
    • Digital Magazine
    • Digital Magazine Archive
  • Features
  • Upstream
  • Midstream
  • Downstream
  • Renewable
    • Solar
    • Wind
    • Hydrogen
    • Nuclear
  • People
  • Events
  • Advertise

© 2025 by Energies Media