Cameron LNG Receives Federal Approval for Liquefaction-Export Project

Sempra Energy subsidiary Cameron LNG received final authorization from the U.S. Department of Energy (DOE) to export domestically produced liquefied natural gas (LNG) from its proposed liquefaction facilities in Hackberry, La., to countries that do not have a free-trade agreement with the U.S.

“Today’s decision marks the last major regulatory hurdle for our Cameron LNG liquefaction-export project, clearing the way for execution of the largest capital project in Sempra Energy’s history,” said Debra L. Reed, chairman and CEO of Sempra Energy. “This landmark project will create thousands of jobs and economic benefits for Louisiana and the U.S. for decades to come, while delivering natural gas to America’s trading partners in Europe and Asia.”

The liquefaction-export project is expected to create approximately 3,000 on-site jobs, as well as several hundred jobs in Louisiana in support of the project, including fabrication, engineering and operational jobs. Nearly 200 full-time jobs will be added to the operations of Cameron LNG.

InventU

Earlier this year, Cameron LNG received authorization from the Federal Energy Regulatory Commission (FERC) to site, construct and operate the three-train liquefaction and export facilities. When fully completed, the project will have export capabilities of 12 million tonnes per annum of LNG, or approximately 1.7 billion cubic feet per day.

“With this final authorization from DOE and the previous permit granted by FERC, we will be able to remain on schedule and commence operations during 2018,” said Octavio M.C. Simoes, president of Sempra LNG.

Last month, Cameron liquefaction project sponsors, Sempra LNG, GDF SUEZ S.A., Mitsui & Co. Ltd., and Mitsubishi Corp., through a related company jointly established with Nippon Yusen Kabushiki Kaisha, each approved a final investment decision for the project. The total project cost will be approximately $10 billion.

Subject to other conditions to the equity and debt financing, Sempra Energy will have an indirect 50.2% ownership interest in Cameron LNG and the related liquefaction project, and the remaining portion will be owned by affiliates of GDF SUEZ, Mitsubishi, and Mitsui, each with 16.6% stakes.

Pipeline
ADIPEC


Agriculture Commissioner Todd Staples Named TXOGA President


Radiant Oil & Gas Buys Additional Acreage in Southern Louisiana


Natural Gas Processing Plant to be Located in SCOOP Play


How Factoring Helps Get it Done in the Oil and Gas Business


API Studies Economic Growth Behind American Oil and Natural Gas


Global Outlook: Ukraine


Mark Your Calendar For ASME’s 2015 Hydraulic Fracturing Conference & Expo!


Shell Sells Haynesville Assets


America Shifting Towards Natural Gas


A Report from #TheNest


Gulf of Mexico Lease Sale Yields $110 Million in Bids


Buckeye Partners Acquires Midstream Assets for $860m


OK Governor, Corporation Commission Address Seismic Activity


One of Halliburton’s First Well Site Vehicles


Energy Programs Essential to Oil and Gas Future


Texas Relinquishment Act Lands: A Case Study for Federal Leasing


An Inevitable Link: Oil and Gas Development in Water Stress Zones


Sasol Receives Permit for GTL Facility


EIA Projects 16M MWh of NG Electric Generation by 2040


Energy Scene: Rocky Mountain Energy and Infrastructure Summit


West Texas


EPA Finalizes Greenhouse Gas Permit for $500M CCI Petroleum Facilities


NGL Energy Partners, Rimrock Midstream Announce Grand Mesa Pipeline


Dupré Logistics Recognized as Top Three in the Nation – AGAIN! Wins Prestigious National 2014 ATA President’s Trophy


Oilman Cartoon: Gasland 3


Anti-Piracy Systems Standing Watch on Vessels in Pirate Infected Waters


Texas Tech Releases Permian Basin Report


Cameron LNG Receives Federal Approval for Liquefaction-Export Project


Texas Saltwater Marsh – Texaco Rig


Oil and Gas Going Social: Will Our Industry Ever Reap the Benefits of Social Branding?

InventU
ADIPEC