Policy Considered for NG Modernization Cost Recovery

The Federal Energy Regulatory Commission (FERC) in November 2014 asked for public comments on a proposed policy statement that would allow interstate natural gas pipelines to recover, through surcharge or tracker mechanisms, certain capital expenditures made to modernize pipeline system infrastructure to enhance reliability, safety, and regulatory compliance.

As a result of regulatory reforms by the Pipeline and Hazardous Materials Safety Administration, interstate pipelines likely will face new standards requiring significant capital cost expenditures to enhance the safety and reliability of their systems. Under recent Environmental Protection Agency initiatives, they also may face increased environmental monitoring and compliance costs, as well as a need to replace or repair existing compressors and other facilities.

The proposed policy statement is meant to ensure that existing FERC ratemaking policies do not create barriers to the ability of pipelines to expedite needed or required upgrades and improvements. In addition to allowing recovery of modernization costs, FERC may consider capital costs to replace compressor facilities or make other improvements in response to increased federal or state environmental regulations as eligible for inclusion in the surcharge.

InventU

Under the proposed policy statement, a pipeline seeking a cost-recovery surcharge would have to meet five standards:

  • The pipeline’s base rates must have been recently reviewed through a rate proceeding or through a collaborative effort between the pipeline and its customers
  • Eligible costs must be limited to one-time capital costs incurred to meet safety or environmental regulations, and the pipeline must specifically identify each capital investment to be recovered by the surcharge
  • Captive customers must be protected from cost shifts if the pipeline loses shippers or increases discounts to retain business
  • There must be a periodic review to ensure rates remain just and reasonable
  • The pipeline must work collaboratively with shippers to seek their support for any surcharge proposal

 

 

BIO
TAMU


A Winning Combination! -Triple-play for the oil and gas industry


Energy Scene: Road Trip Across America’s Shale Play


1950s Gulf of Mexico: Early Noble Drilling Offshore Rig


SCT&E LNG Receives DOE Approval for Export


Make a #TwitterResolution


Energy Department Authorizes Freeport LNG for Export


Partnership to Build NGL Pipeline


Oil and Natural Gas Inspection: Training, Discipline, and Maximizing Pipeline Pilum


Policy Considered for NG Modernization Cost Recovery


Oil & Gas Education News


Apache Sells O&G Assets for $1.4bn


Continental Joint Venture to Develop Northwest Cana Woodford Shale


Express PumpJacks


Q & A With Jason Spiess: Innovation


Therm Dynamics Mid-Continent Dealer: Globec Resources, LLC


Hess Plans Offshore Development of Stampede


Continental Completes Four Springer Wells in SCOOP


Time For a Reasonable Assessment of Oil Prices


Monarch Launches Open Season


1920s West Texas: One of Halliburton’s First Vehicles


Railroad Commission Amends Disposal Well Rules


Bill to Approve Keystone XL Pipeline Fails in Senate


Letter from the Publisher


Repsol Discovers Oil Offshore at León


TXOGA, Land Office File Suits against City of Denton


Plains All American to Build Pipeline from Duncan to Longview


Eisenhower’s Energy Vision


EPA: Oil Reserves Surpass 36bn barrels


J-W to Acquire BHP’s Northern Louisiana Properties


Cartoon In Closing: Texas Roughnecks Freeze Faster


Chevron Makes Offshore Oil Discovery in Wilcox Sands


Plains All American to Acquire Interest in BridgeTex


Halliburton to Acquire Baker Hughes


American Energy Minerals Raises $500m


Halcon Scales Back In Tuscaloosa Marine Shale


The Oil and Gas Knowledge Curve: Young Professionals in Energy Allows the Torch to be Passed & Knowledge Transfer to Flourish


Louisiana Voters Approve Amendment 8


Venture Global to Develop LNG Export Facility

E-Fuels
InventU