Energies Media
  • Magazine
    • Energies Media Magazine
    • Oilman Magazine
    • Oilwoman Magazine
    • Energies Magazine
  • Upstream
  • Midstream
  • Downstream
  • Renewable
    • Solar
    • Wind
    • Hydrogen
    • Nuclear
  • People
  • Events
  • Subscribe
  • Advertise
  • Contact
    • About Us
No Result
View All Result
No Result
View All Result
Energies Media
No Result
View All Result

EPIC Pipeline Announces Completion of Phase One of its 700-Mile Pipeline From the Permian Basin to Corpus Christi

by Energies Media Staff
April 6, 2018
EPICMid.com
Gastech

SAN ANTONIO, April 2, 2018 – EPIC Y Grade Pipeline, LP, a subsidiary of EPIC Y Grade Holdings, LP and EPIC Midstream Holdings, LP, {“EPIC”} today announced that Phase One of the natural gas liquids (“NGL”) pipeline from DLK Black River Midstream to Delaware Basin Midstream is complete and operating on schedule.

NGL product was introduced to the pipeline on March 12.  Phase Two is currently under construction with an expected in-service date of June 2018.  Phase Three is expected to be complete in the second half of 2019.  When complete, the EPIC NGL pipeline will have a throughput capacity of 350,000 barrels per day with multiple origin points in the Delaware and Midland Basins.

The pipeline will have origination points near Orla and Benedum with a destination in Corpus Christi, Texas.  At the terminus of the pipeline, EPIC is building a fractionation complex to accommodate the pipeline’s volume.  EPIC is also building a purity product pipeline distribution system, including an ethane pipeline to the Markham area.

Radian Generation

Radian Generation Supports Successful Launch of 525 MWac Solar Project in Utah with Compliance and Cybersecurity Services

December 3, 2025
A case study from Wanqiu Chen’s way of Modernizing Utilities Through Smart Capital Program Management

Engineering Progress: A case study from Wanqiu Chen’s way of Modernizing Utilities Through Smart Capital Program Management

May 13, 2025
H&P Introduces Cat® Dynamic Gas Blending™ (DGB) Gen 2 Kit to Operations for Enhanced Drilling Performance and Fuel Efficiency

H&P Introduces Cat® Dynamic Gas Blending™ (DGB) Gen 2 Kit to Operations for Enhanced Drilling Performance and Fuel Efficiency

April 28, 2025

EPIC began construction of the NGL pipeline in December of 2017 after signing a definitive agreement with BP Energy Company to anchor the 700-mile NGL pipeline to link producers’ NGL reserves in the Permian and Eagle Ford Basins to Gulf Coast refiners, petrochemical companies and export markets.

EPIC completed a FERC open season earlier this month to offer interested shippers an opportunity to secure firm capacity on the EPIC NGL Pipeline.

EPIC secured a capital commitment last year from funds managed by Ares Management, L.P.  Since then, work has been underway on the NGL Pipeline which runs side-by-side with the previously announced EPIC Crude Oil Pipeline.

ESF
Author Profile
Energies Media Staff
Website
Author Articles
  • Energies Media Staff
    The Energy-Agriculture Nexus: Where Clean Energy Policy Meets Crop Production
  • Energies Media Staff
    The Mineral Rights Sale Checklist Texas Owners Should Follow Before Signing Anything
  • Energies Media Staff
    How Government Infrastructure Funds Are Reshaping Energy Project Guarantees
  • Energies Media Staff
    Top 10 Energy Software Development Companies for 2026
  • Energies Media Staff
    The Growing Demand for Transparency in Energy Sector Reporting
  • Energies Media Staff
    Managing Produced Water in Modern Energy Operations
WUC

Energies Media Winter 2026

ENERGIES (Winter 2026)

IN THIS ISSUE


Letter from the Editor-in-Chief (Winter 2026)


The Duality of Landman’s Andy Garcia


The Importance of Innovation in LWD Technologies: Driving Formation Insights and Delivering Value


Energies Cartoon (Winter 2026)


Infrastructural Diplomacy: How MOUs Are Rewiring Global Energy Cooperation


Why Lifecycle Thinking Matters In FPSO Operations


The Vendor Trap: How Oil And Gas Operators Can Build Platforms That Scale Without Losing Control


Pumping Precision: Solving Produced Water Challenges with Progressive Cavity Pump Technology


Protecting Critical Infrastructure and Operations in the Digital Age


Kellie Macpherson, Executive VP of Compliance & Security at Radian Generation

Gastech
WUC
  • Terms
  • Privacy

© 2026 by Energies Media

No Result
View All Result
  • Magazine
    • Energies Media Magazine
    • Oilman Magazine
    • Oilwoman Magazine
    • Energies Magazine
  • Upstream
  • Midstream
  • Downstream
  • Renewable
    • Solar
    • Wind
    • Hydrogen
    • Nuclear
  • People
  • Events
  • Subscribe
  • Advertise
  • Contact
    • About Us

© 2026 by Energies Media