Energies Media
  • Magazine
    • Energies Media Magazine
    • Oilman Magazine
    • Oilwoman Magazine
    • Energies Magazine
  • Upstream
  • Midstream
  • Downstream
  • Renewable
    • Solar
    • Wind
    • Hydrogen
    • Nuclear
  • People
  • Events
  • Subscribe
  • Advertise
  • Contact
    • About Us
No Result
View All Result
No Result
View All Result
Energies Media
No Result
View All Result

Targa Resources to construct 500-mile “Speedway” NGL pipeline linking the Permian to Mont Belvieu

by Warren
November 26, 2025
Enterprise and ExxonMobil to increase US pipeline capacity
Gastech

The American energy market has been booming as of late, with several projects being revived or existing projects receiving renewed attention from the government and energy companies. Now, Targa Resources, a leading provider of midstream services in North America, has stated its plans to construct a new “Speedway” natural liquefied gas pipeline connecting the Permian to Mont Belvieu, Texas. The company has big plans for the US energy market, with gas and NGL playing a vital role in the company’s ambitions.

Targa Resources to target a new energy pipeline in the Permian basin

The Permian basin has become as part of the American identity as Apple pie, with several of the world’s largest energy companies all developing projects in the region. The Permian is also home to one of the world’s largest oil deposits.

Targa Resources recently unveiled its plans to construct a new 500-mile “Speedway” NGL pipeline that will run from the Permian basin to several processing plants in Texas. The company already boasts approximately 1 million barrels per day of natural gas liquids being transported on its existing pipeline in the region, with plans to construct a new gas pipeline.

Kinder Morgan application pipeline

Kinder Morgan submits regulatory application for the proposed Mississippi Crossing gas pipeline

March 20, 2026
Williams pipeline

Williams advances expansion work on the Northeast Supply Enhancement natural gas pipeline project

March 19, 2026
Natural gas pipeline negotiate rate arrangements

Natural Gas Pipeline Company of America continues negotiated rate arrangements for pipeline transportation services

March 18, 2026

The new Speedway pipeline will connect the company’s vast assets in the Permian and any new plant additions to Targa’s fractionation and storage complex in Mont Belvieu, Texas.

Targa’s astonishing plans for the American energy market are reaching a tipping point

The new “Speedway” project will consist of 500 miles of 30-inch diameter pipeline and associated infrastructure, with an expected initial capacity of ~500 thousand barrels per day, which could be doubled to 1,000 barrels if needed. The project is expected to be completed in the third quarter of 2027, and costs are estimated at approximately $1.6 billion.

Targa is also moving forward with its plans to construct new gas processing facilities

The company has stated that, in order to accommodate any future growth in the region, it will focus on the construction of its next 275 million cubic feet per day gas processing plant, called the Yeti plant, which is also expected to come online in Q3 of 2027.

Additionally, Targa also has plans to construct five gas processing plants in the Permian that will come online over the next two years. The project comes off the back of a new deal between the United States and Japan that calls for billions to be invested in America’s gas and NGL infrastructure.

“We have benefited from meaningful volume growth across our Permian Basin assets this year, and our outlook for volume growth in 2026 continues to remain robust. Given the NGLs currently flowing through our system and numerous plant additions in progress, we will have significantly more volumes to move on Speedway when it comes into service. The strength of our outlook over the near, medium and long term is supported by multiple factors. Speedway is critical to the continued execution of our core integrated wellhead to water strategy, will generate attractive and growing fee-based cash flows, and will provide Targa with significant operating leverage once in service.” – Matt Meloy, Targa’s Chief Executive Officer

The Permian basin is set to see several new pipelines being constructed in the near future

The Permian basin has been the cornerstone of the American gas and oil sectors for decades, and with Targa’s announcement of the new “Speedway” pipeline, along with another pipeline being constructed by Enbridge, called the Whistler pipeline, the Permian is set to continue to play a vital role in the US energy market for many years to come. The US has work to do to develop its energy infrastructure, especially following its decision not to attend the G20 summit in South Africa.

Author Profile
Warren
Author Articles
  • Warren
    INA targets first-quarter 2026 finish for its €700 million overhaul of the Rijeka refinery to expand downstream output
  • Warren
    Intensity Infrastructure Partners teams up with Rainbow Energy Center to advance a new natural gas pipeline project in North Dakota
  • Warren
    TotalEnergies grows its Malaysian upstream presence with the award of an additional exploration acreage
  • Warren
    Technip Energies wins large-scale awards to deliver additional processing units at BPCL’s Bina and Mumbai refineries
  • Warren
    WhiteWater boosts throughput on the Eiger Express gas corridor, lifting mainline capacity to 3.7 Bcf per day
  • Warren
    Orlen strengthens its North Sea footprint by acquiring an interest in the Afrodite discovery on Norway’s continental shelf
WUC

Energies Media Winter 2026

ENERGIES (Winter 2026)

IN THIS ISSUE


Protecting Critical Infrastructure and Operations in the Digital Age


The Vendor Trap: How Oil And Gas Operators Can Build Platforms That Scale Without Losing Control


The Importance of Innovation in LWD Technologies: Driving Formation Insights and Delivering Value


Kellie Macpherson, Executive VP of Compliance & Security at Radian Generation


Energies Cartoon (Winter 2026)


The Duality of Landman’s Andy Garcia


Pumping Precision: Solving Produced Water Challenges with Progressive Cavity Pump Technology


Why Lifecycle Thinking Matters In FPSO Operations


Letter from the Editor-in-Chief (Winter 2026)


Infrastructural Diplomacy: How MOUs Are Rewiring Global Energy Cooperation

Gastech
WUC
  • Terms
  • Privacy

© 2026 by Energies Media

No Result
View All Result
  • Magazine
    • Energies Media Magazine
    • Oilman Magazine
    • Oilwoman Magazine
    • Energies Magazine
  • Upstream
  • Midstream
  • Downstream
  • Renewable
    • Solar
    • Wind
    • Hydrogen
    • Nuclear
  • People
  • Events
  • Subscribe
  • Advertise
  • Contact
    • About Us

© 2026 by Energies Media