Ensuring sufficient supply at the main intake is not the end of the story for an AI data center. Ensuring the availability of that supply to all key loads, following a fault, planned maintenance, or increased utilization, is what should be addressed.
Simply providing additional transformers or supply sources at the site boundary may be of little benefit, if the distribution can be interrupted by a fault on a common element. In that case, the choice of switchgear becomes a reliability consideration for the site as a whole.
Global electricity consumption from data centers is forecast by the IEA (April 2026) to increase from 485TWh in 2025 to ~950TWh by 2030. Securing continued availability of supply to all critical loads will become more important as these figures rise.
may be available, and used to flag and diagnose any potential issues, enabling corrective action, and, where appropriate, planned maintenance, to be undertaken.
What You’ll Learn
- How an AI Data Center’s Power Needs Differ
- Overview of Gas Insulated Switchgear
- Ensuring Resilience Against Electrical Faults
- Specification Considerations
- Operation and Maintenance
- Summary
How an AI Data Center’s Power Needs Differ
Data centers require reliable, uninterrupted electrical supply, but an AI data center can place greater, more variable demand on that supply, particularly with large compute resources starting, pausing, or checkpointing model training runs.
UPS and other power electronics can change the load seen upstream and create power-quality concerns. Designers still need realistic load profiles, not just average demand.
Another potential issue can arise from progressive build-out of a data center, where the initial electrical design and distribution may no longer be fit for purpose, or be constrained, as further halls come on stream.
Care should be taken to reserve adequate capacity, space and cabling routes, and consider the implications of adding additional sections of switchgear, to allow for expansion without interrupting existing running load.
In their 2026 report, the Uptime Institute highlighted increased complexity and reduced power availability as factors that continue to contribute to outages. Robust design, and future-proofing, of the distribution system is therefore important for ensuring maximum reliability.
Overview of Gas Insulated Switchgear
As with conventional, air-insulated switchgear, medium-voltage switchgear can be used to distribute power across a data center and, provided there are appropriate protections, disconnect and isolate from faults within the system.
In GIS, some or all compartments are sealed and filled with gas, surrounding energized parts, allowing tighter spacing between them, as well as protection of these components from external ingress.
If space is a constraint, gas-insulated switchgear can provide a space-saving alternative, or, if an outdoor installation is suitable, this can also provide the required rating with a lower overall footprint.
It is still important, however, to ensure the ability to isolate, and, if necessary, repair, parts of the switchgear, and the wider electrical network, in the event of, e.g., an upstream cabling fault, incorrect protective device setting, etc.
Also, note that gas-insulated switchgear does not necessarily mean that fault current is interrupted in gas – some designs incorporate vacuum breakers, so this should be confirmed prior to making any assumptions about the equipment under consideration.
Compare layouts by their access, isolation, repair and restoration provisions, not footprint alone.
Ensuring Resilience Against Electrical Faults
Use the single-line diagram to test loss of a component or power path. Check whether critical loads remain supplied or a suitably rated alternative is available.
A few examples to consider during this exercise:
- Loss of one incoming supply, and ability to isolate the affected area without impacting others
- Planned maintenance on one section, and availability of alternate, suitably rated supply source
- Loss of an upstream supply, and response of associated automatic transfer, protections, etc.
- Addition of future sections, and ability to isolate and provide additional supplies, without any common points of failure
A bus-tie may be used, for example, to reinstate an affected bus following a fault, but care must be taken to ensure it is operated correctly, and that the alternate source can accommodate the additional loading, with appropriate protection coordination.
Similarly, any redundancy introduced should be assessed, to ensure that there is no shared point of failure, such as a cable, etc., upstream of the redundant elements.
Uptime Institute defines Tier III as concurrently maintainable: each capacity component or distribution path can be removed for planned work without disrupting operations. Tier IV adds fault tolerance for an individual equipment failure or path interruption. These outcomes depend on the whole site design, not one switchgear lineup.
Specification Considerations
“Reliable” is not, in itself, a meaningful spec criterion, and a number of parameters should be evaluated to ensure the correct switchgear, with the required protection, is specified, based on the results of appropriate studies and calculations.
These include, at a minimum:
- Voltage, current, etc. rating, to meet existing and future requirements, including any environmental considerations
- Rated breaking/withstand capacity, based on prospective fault level, taking into account any changes to the upstream network over time, etc.
- Protection, control and auxiliary supply, including the effect of any loss, and protection coordination, as well as indication, alarming, etc.
- Arc resistance: check the assembly’s test classification and installation conditions. Gas insulation alone does not establish an arc-resistant rating.
- Adequate space, access and clearance to enable connection, inspection, isolation and repair
IEEE C37.20.9-2025 covers metal-enclosed switchgear that incorporates gas insulating systems. Check the specified lineup’s test reports, relevant approvals, and site suitability.
Consideration should also be given to the suitability of indoor or outdoor installation, and the implications of the latter, such as water run-off, temperature, security, cabling, etc.
Always review the full, detailed information provided with any switchgear quotation, to ensure the proposed solution is fit for the specific application, and not solely rely on generic, nominal values.
Operation and Maintenance
Before energization, verify the installed switchgear against approved drawings and manufacturer instructions. Test protection, controls and switching procedures, and retain commissioning records.
Give operators the final single-line diagram, approved switching and emergency procedures, and protection settings. Keep these records accessible during faults, including outside business hours.
Check planned responses to source loss, feeder faults and transfer failures during commissioning. Use approved simulations or controlled tests; do not deliberately create a live fault.
Post-commissioning, condition and health monitoring, e.g. gas density, temperatures, partial discharge, breaker status, etc. may be available, and used to flag and diagnose any potential issues, enabling corrective action, and, where appropriate, planned maintenance, to be undertaken.
Define each alarm threshold, response owner and escalation step. Record which actions require an outage so problems can be addressed before they worsen.
It should also be noted that, depending on the design, gas-insulated equipment may use SF6, which the US EPA has classified as having an extremely high global warming potential, and steps should be taken to manage, or minimize, leakage, and, potentially, consider alternatives, before procurement, if possible.
Sealed gas-insulated equipment may reduce contamination, but it still requires inspection, testing and any necessary gas work. Qualified staff must follow manufacturer instructions.
Summary
Gas-insulated switchgear can ease space and contamination concerns, but dependable supply still depends on the full site design, especially during faults and maintenance.
Plan alternative paths, protection, expansion and maintenance access early, then check that the chosen equipment supports the design.