Energies Media
  • Magazine
    • Energies Media Magazine
    • Oilman Magazine
    • Oilwoman Magazine
    • Energies Magazine
  • Upstream
  • Midstream
  • Downstream
  • Renewable
    • Solar
    • Wind
    • Hydrogen
    • Nuclear
  • People
  • Events
  • Subscribe
  • Advertise
  • Contact
    • About Us
No Result
View All Result
No Result
View All Result
Energies Media
No Result
View All Result

Congo and Russia to start building Pointe-Noire–Loutété–Maloukou-Tréchot pipeline by late 2025

by Warren
November 15, 2025
Transwestern establishes open season for new pipeline
Gastech

Following the latest round of sanctions on Russia by the European Union as well as the United States, Moscow is turning its attention to the small group of nations still willing to do business with it. One such nation is the African stalwart that is the Republic of Congo. Congo and Russia have plans to start building a massive pipeline in the African nation known as the Pointe-Noire–Loutété–Maloukou-Tréchot pipeline by the end of the year. Yes, the name of a mouthful, but the impact of the project simply can not be understated.

Russia is aiming to create a sanctions-protected channel for petroleum product supplies

The latest round of sanctions on Russia has devastated the nation’s energy industry, as well as the global economy. From the first day when the EU imposed its 19th round of sanctions on Russia, the price of oil skyrocketed as suppliers and customers reacted to the decrease in energy supplies, which normally leads to an increase in prices.

In order not to see its energy sector completely disappear overnight, Russia is aiming to develop a sanctions-protected channel for petroleum product supplies. One such method to ensure its energy sector survives the new sanctions is through the cooperative relationship with the Democratic Republic of the Congo. The pair has agreed to terms on a new energy product pipeline that connects the largest cities in the Congolese nation.

TC Energies Coastal GasLink Phase 2

TC Energy Establishes Commercial Framework to Enable Coastal GasLink Phase 2 Expansion

April 3, 2026
Blackstone EQT Mountain Valley Pipeline

Blackstone and EQT increase equity stakes in the Mountain Valley Pipeline partnership

April 2, 2026
Enbridge gas transmissions assets

Enbridge expects 2026 growth supported by gas transmission assets and newly commissioned projects

April 1, 2026

The Pointe-Noire–Loutété–Maloukou-Tréchot pipeline is set for a Q4 2025 completion date

The project is being developed and constructed by a joint venture between the Congo and Zakneftegazstroy-Promety, a leader in pipeline construction in Russia. Government and business officials from the Congo and Russia have praised the progress made on-site and have noted that they expect the project to be rolled out by the end of the year, with commitments made to follow up on the timeline.

The deal was inked into reality in Moscow way back in 2024

The project was agreed upon by both parties in Moscow in 2024 and provides a stable and welcoming environment for the construction phase by the Russian pipeline operator, which is a far cry from what the rest of the world is hoping for. The new wave of sanctions on Russia and its vast array of energy companies has led some operators, such as Lukoil, to divest their holdings in foreign assets, devastating their stock prices in the process.

Zakneftegazstroy-Prometey LLC and the National Petroleum Company of the Congo will develop a joint project that enables Russia to receive the vast majority of the financial returns from the project, 90% to be exact, while Congo gets the 10% scraps. To implement the project successfully, the pair will develop a joint venture for constructing and operating the pipeline for 25 years.

With the new sanctions on Russian energy set to come into effect over the next two or three years, Russia is diversifying its energy portfolio and opting to do business with nations outside the purview of the EU or the United States. Congo has been ravaged by civil war for decades, and only recently began operations in its energy sector.

The end of the Russian dominance of the energy sector has been accelerated

The news of the Pointe-Noire–Loutété–Maloukou-Tréchot pipeline entering the construction phase in Q4 of this year must be giving some hope to Moscow. The unforgiving and volatile sanctions on Russia are only the first step in the EU’s plans to end Russia’s dominance of the international energy sector. The EU has plans to develop a joint purchasing platform for non-Russian energy supplies; this move points to the fact that Moscow is facing a precarious end to its energy sector, although the Congolese pipeline has given it some hope.

ESF
Author Profile
Warren
Author Articles
  • Warren
    INA targets first-quarter 2026 finish for its €700 million overhaul of the Rijeka refinery to expand downstream output
  • Warren
    Intensity Infrastructure Partners teams up with Rainbow Energy Center to advance a new natural gas pipeline project in North Dakota
  • Warren
    TotalEnergies grows its Malaysian upstream presence with the award of an additional exploration acreage
  • Warren
    Technip Energies wins large-scale awards to deliver additional processing units at BPCL’s Bina and Mumbai refineries
  • Warren
    WhiteWater boosts throughput on the Eiger Express gas corridor, lifting mainline capacity to 3.7 Bcf per day
  • Warren
    Orlen strengthens its North Sea footprint by acquiring an interest in the Afrodite discovery on Norway’s continental shelf
WUC

Energies Media Winter 2026

ENERGIES (Winter 2026)

IN THIS ISSUE


Pumping Precision: Solving Produced Water Challenges with Progressive Cavity Pump Technology


Energies Cartoon (Winter 2026)


The Importance of Innovation in LWD Technologies: Driving Formation Insights and Delivering Value


Why Lifecycle Thinking Matters In FPSO Operations


The Duality of Landman’s Andy Garcia


Kellie Macpherson, Executive VP of Compliance & Security at Radian Generation


Infrastructural Diplomacy: How MOUs Are Rewiring Global Energy Cooperation


Letter from the Editor-in-Chief (Winter 2026)


Protecting Critical Infrastructure and Operations in the Digital Age


The Vendor Trap: How Oil And Gas Operators Can Build Platforms That Scale Without Losing Control

Gastech
WUC
  • Terms
  • Privacy

© 2026 by Energies Media

No Result
View All Result
  • Magazine
    • Energies Media Magazine
    • Oilman Magazine
    • Oilwoman Magazine
    • Energies Magazine
  • Upstream
  • Midstream
  • Downstream
  • Renewable
    • Solar
    • Wind
    • Hydrogen
    • Nuclear
  • People
  • Events
  • Subscribe
  • Advertise
  • Contact
    • About Us

© 2026 by Energies Media